Korea Construction of the Gimpo-Paju Expressway 2
Summary
It is a power district construction that connects the new 345kV power line from the applicant S/S to the new C/H in Jidong-dong for load sharing and stable power supply following the development of industrial complexes in Cheongju, Jincheon, and Eumseong. This project is a Slurry Type TBM tunnel construction that passes through weathering, soft, and hard rocks with a length of 2.72km and a direct length of 4.5m.
-
Begin 2020.07
Client Korea Expressway Corporation
-
Location Gimpo, Gyeonggi-do, Republic of Korea
Explanation Total excavation extension: L = 5,724 m (1 Slurry TBM)
- Excavation diameter: D=14,100 mm
- Paju Direction: 2,862m
- Gimpo direction: 2,862m
Wing Slab L = 5,724m
Four CROSS PASSAGE